WENGNews writes, "THE OVERBROOK ROAD BRIDGE IN ENGLEWOOD WILL BE CLOSED TO ALL VEHICULAR AND PEDESTRIAN TRAFFIC STARTING TOMORROW THRU APRIL 10TH SO THE ENGLEWOOD WATER DISTRICT CAN REPLACE THEIR UTILITY CONNECTIONS. A SECOND PLANNED CLOSURE THAT WILL LAST MOST OF THE SUMMER WILL TAKE PLACE STARTING JUNE 1ST TO REPLACE THE ENTIRE BRIDGE. DURING THE CLOSURES, TRAFFIC WILL BE DETOURED VIA ALAMANDER AVENUE TO MANASOTA BEACH ROAD. ELECTRONIC MESSAGE BOARDS ARE IN PLACE NOTIFYING MOTORIST OF THE CLOSURES. PRELIMINARY WORK ON THE BRIDGE HAS BEGUN, AND THERE MAY BE INTERMITTENT LANE CLOSURES WHEN THE BRIDGE IS OPEN DURING CONSTRUCTION. FLAGMEN WILL BE PRESENT TO DIRECT TRAFFIC DURING CLOSURES. "