

|
What's On
|


|


|
Upcoming Events
|


|

|
Tide Predictions
|


|

|
|
|
Articles
|

| CONE ZONE INFORMATION FOR WEEK OF MARCH 17TH |
|
WENGNews writes, "HERE ARE SOME OF THE AREAS THAT MIGHT SLOW YOU DOWN THIS WEEK AS ROAD CONSTRUCTION CREW DO THEIR THING. IN NOKOMIS, CREWS WILL CONTINUE WORKING IN THE AREAS OF COLONIA LANE BETWEEN CENTRAL AVENUE AND ALBEE FARM ROAD, AND EAST OF ALBEE FARM ROAD BETWEEN COLONIA LANE AND KILPATRICK ROAD AS PART OF THE NOKOMIS WATER LINE PROJECT. MOTORISTS SHOULD USE CAUTION IN THESE AREAS. WORK SHOULD BE COMPLETED IN THESE AREAS BY THE SPRINGTIME. IN VENICE, THERE WILL BE ONE-LANE CLOSURES, ALTERNATING BETWEEN EASTBOUND AND WESTBOUND LANES OF JACARANDA BOULEVARD THIS WEEK WHILE WORK IS DONE ON THE MEDIANS. THAT SHOULD LAST THRU THE END OF THE MONTH. AND THERE ARE TWO AREAS IN ENGLEWOOD TO WATCH OUT FOR. CONSTRUCTION BEGINS THIS WEEK ON REPLACEMENT OF THE OVERBROOK ROAD BRIDGE. MOTORISTS SHOULD EXPECT MINOR DELAYS AND POSSIBLE DAILY LANE CLOSURES, AS NEEDED. THE OVERBROOK BRIDGE IS SLATED TO CLOSE TO VEHICULAR TRAFFIC ON MARCH 29TH AND REOPEN ON APRIL 11TH. TRAFFIC WILL BE DETOURED TO MANASOTA BEACH ROAD, WITH ACCESS TO OVERBROOK ROAD EAST OF THE BRIDGE. THE ENTIRE PROJECT, WHICH INCLUDES INSTALLATION OF SIDEWALKS AND REPLACEMENT OF SEA WALLS, IS EXPECTED TO LAST UNTIL AUGUST. AND YOU CAN EXPECT LANE CLOSURES IN THE AREA OF THE DEARBORN STREET IMPROVEMENT PROJECT WHILE BRICK PAVERS ARE INSTALLED. OTHER ACTIVITIES THIS WEEK INCLUDE CONSTRUCTION OF THE TRAFFIC RAILING ON THE DEARBORN STREET BRIDGE AND THE ROADWAY ON THE EAST AND WEST SIDES OF THE BRIDGE AND INSTALLATION OF LIGHT POLE BASES ON THE SOUTH SIDE OF THE ROAWAY. CONSTRUCTION ON THE PROJECT IS EXPECTED TO BE COMPLETED BY JULY. "
|
|
.
|
Posted on Mar 18, 2008 06:18am.
(Return)
|
|
|
|
|
Categories
|


|

|